What is the lead time for each stage of the process?
Question: What is the lead time for each stage of the process?
Answer: The typical lead times for projects that do not require custom fabric, trim, and concept development are as follows:
Traditional Brands:
- Tech Pack Development: 1-2 weeks
- Sourcing: 3-5 days
- Sampling: 1-2 weeks
- Bulk Production: 4-6 weeks
- Quality Control Inspection: 1-2 days
- Packing and Shipping: 2-3 days
Fast Fashion Brands:
- Tech Pack Development: 1-3 days
- Sourcing: 1-2 days
- Sampling: 3-7 days
- Bulk Production: 2-4 weeks
- Quality Control Inspection: 1 day
- Packing and Shipping: 1 day
At Jinfeng Apparel, we understand that different brands have unique timelines and requirements. Our streamlined processes ensure that whether you’re a traditional brand or a fast fashion label, we can meet your deadlines with efficiency and precision.
For traditional brands, the process includes comprehensive tech pack development, sourcing of materials, detailed sampling, bulk production, stringent quality control checks, and efficient packing and shipping. This ensures that every aspect of production meets high-quality standards.
For fast fashion brands, we expedite the process to meet the rapid turnover demands. From swift tech pack development and sourcing to quick sampling and bulk production, our process is optimized to deliver your products in the shortest time possible without compromising on quality.
These timelines are designed to cater to the specific needs of your brand, ensuring that we provide you with the best possible service and products. For projects requiring custom fabric development or additional customizations, please contact us for a detailed timeline and consultation.